Customization: | Available |
---|---|
Certification: | CE, ISO9001: 2000 |
Customized: | Customized |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
1) Raw material: use hopper trolley delivery into mixer; need 2 workers
2) Mixer: Mixing and produce concrete, then conveyor delivery concrete to block machine hopper; need 1 worker
3) Hollow block machine: Forming blocks, then delivery to stacker by block receiver; no need workers
4) Maual forklift trolley: delivery new blocks to curing area; need 2 workers
5) Curing area: Curing need 10-15 days, then take blocks out from pallet; need 1-2 workers
6) Trolley: delivery pallet to hollow block machine area; need 1 worker
7) Sell blocks: Sell blocks and management; 1 worker
Total need about 7-8 workers in QTJ4-25 hollow block machine factory.
Block Type | Block size | Pcs/mould | Pcs/8 hour |
Hollow/Solid block | 400*200*200mm |
4pcs | 4800pcs |
Houdi block | 520*120*200mm | 7pcs | 7200pcs |
S shape paver | 225*112.5*60mm | 12pcs | 14000pcs |
I shape paver | 200*160*60mm | 8 pcs | 9600pcs |
1)ProductName |
QTJ4-25 China hot saling fly ash bricks machine manufacturers | |
2)Standards |
ISO9001/CE/SGS |
|
3)Overall Size |
3000(L)×1600(W)×2500(H)mm |
|
4)Cycle |
25 Seconds |
|
5)Raw Material |
concrete, sand, cement and others |
in your condition |
6)Carriage Size |
GMT pallet Plastic pallet Bamboo pallet |
900(L)*550(W)*20(H)mm 900(L)*550(W)*20(H)mm 900(L)*550(W)*25(H)mm |
7)Weight |
4000kg |
|
8)Packing |
20FT container | |
9)Price Term |
FOB Qingdao,China |
CFR,CIF |
10)ShippingMethod |
By Sea |
|
11)PaymentTerms |
T/T, L/C, WestUnion |
|
12)Production Time |
20-30 days after got 30% deposit |